Ballyjamesduff wastewater treatment works(wwtw) in Cavan, is a 2,000 pe extended aeration works using an oxidation ditch to achieve simultaneous nitrification and de-nitrification and has a tertiary clarifier to achieve a 10:10 BOD:TSS final effluent with N and P reduction, as the final effluent is being discharged into the Lough Sheelin catchment.
The project was procured using a traditional consultant led design contract with the preliminary report, detailed design, contract documents and contract management undertaken by Dara White when he worked with PH McCarthy and Partners.